Slide the worm gear on to the shaft. Line up the drilled holes in the shaft with the ones on the gear. :)
expressline99

Slide the worm gear on to the shaft. Line up the drilled holes in the shaft with the ones on the gear. :)

You'll notice this shaft is different than the first pictures of it... this is the one I had to make.
It can take up to an hour for ads to appear on the page. See our code implementation guide for more details. If you already have Auto ad code on your pages there's no need to replace it with this code

Media information

Album
Bridgeport Series 1 VS 2hp Upper belt housing tear down and rebuild
Added by
expressline99
Date added
View count
342
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Device
NIKON COOLPIX S560
Aperture
ƒ/3.5
Focal length
6.3 mm
Exposure time
1/39
ISO
400
Flash
Auto, did not fire
Filename
DSCN5688.JPG
File size
2.2 MB
Date taken
Fri, 19 May 2017 4:04 PM
Dimensions
3648px x 2736px

Share this media

Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock