Start rebuild. After everything is cleaned up. Lightly oil the speed change shaft before inserting into the housing.
expressline99

Start rebuild. After everything is cleaned up. Lightly oil the speed change shaft before inserting into the housing.

Media information

Album
Bridgeport Series 1 VS 2hp Upper belt housing tear down and rebuild
Added by
expressline99
Date added
View count
571
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Device
NIKON COOLPIX S560
Aperture
ƒ/5.6
Focal length
6.3 mm
Exposure time
1/60 second(s)
ISO
200
Flash
Auto, fired
Filename
DSCN5686.JPG
File size
2.1 MB
Date taken
Wed, 10 May 2017 5:38 PM
Dimensions
3648px x 2736px

Share this media

Back
Top