My understanding of a demand charge is "demand charge is based upon the maximum amount of power required over a single hour (or fifteen-minute period) in a given month" so the startup current of a 3-phase motor that is most likely over seconds would not be significant if the assessment of peak consumption window is calculated over 15 minutes, but would be impactful if it was just the peak at any time. That being the case, a small reduction or tuning of the motor RPM could result in significant reduction in power consumption, which is the bases for most variable speed pool pumps. Since fluid pumps are variable torque, a small reduction in speed say 10% decrease in flow could result in a 30% decrease in power consumption (there are calculators for this). Fuji VFDs are often used in this application as being quite cost effective in particular if you are using them with single phase input in a derated mode. The other factor is that with variable speed you could optimize flow over time and reduce power significantly, same idea with variable speed pumps in various applciations.Would a soft start lower the demand charge on a thirty horse 3 phase motor. Every month that pump is turned on is 5 hundred even if it is on then back off

Mike I do not know about California but here the rates go up and down depending on the time of the day. During the heat of the day the Power company charges more because they can, and there is more demand when everyone is at work in the factories and offices. Then it goes down during the off hours of the daily cycle. I do not care what it cost when it is hot outside I want to be cool inside so during the summer season my monthly bill is usually tripple. How ever if your house is empty during the day meaning kids at school wife at work and you at work it might be worth looking into setting a range of temperatures in the thermostat during the work day. Weekends can also be set differently. I have a programable thermostat but I just leave it on 76 degrees F in the summer and usually around 74 in the winter. I look at it like this I can save money on my utility bill by being hot and the kids can spend the money when I am gone or I can stay cool. Sorry Kids LOLI have some reservations about continuing the upgrade.
I opened the control enclosure and found a possible fly in the ointment.
View attachment 578782
Up in the right corner there is a small control board.
I’m not sure if adding the soft starter would create havoc with the boards function or blow da sumbeyotch up.
So i decided to pause and gather more information before proceeding.
I don’t want to fix a problem that I just caused on something that wasn’t broken already.
(Yes it was dirty and full of cobwebs, but I cleaned it out and feel better about it!)
They are in areas where they are billed for max current draw. So yeah it makes a difference.Soft starters won't lower your bills, but they can make a generator much happier!
Btw, the optimal point for fancy A/C systems is two speed. That is done with dumb relaysproprietary vfds suck, are expensive, and go out of production fast.
Two speed is a pretty significant efficiency boost, and can improve humidity control quite a bit.
Sent from my SM-S911U using Tapatalk
I agree Woody there is a reason they spent all the money up front to install all the smart meters other than the labor to read the meters once a month. We are living in a world that is now just a huge microwave oven. My water meter is even a smart meter . Not to mention the hundreds of cell towers in the county. And when it comes to the issue of AI data centrs I have the Right to Remain Silent.They are in areas where they are billed for max current draw. So yeah it makes a difference.