Building a house ...

Lots of little things making slow progress.
Yard got contoured, manure mixed in, a bit of agricultural lime (aka limestone sand), and seeded. Grass has sprouted and we're expecting rain tonight and tomorrow so that should help. Always a bit of a timing game getting grass started in the fall, fall is usually quite dry, and the rain starts just before the temperature drops for the winter. So hoping for a bit of moderate temperatures and light rain for a few more weeks. We're on enough of a hill that we need the grass before winter or the spring rains will erode things badly.

Also installed the fiber cable (internet) to the house. My internet actually hubs out of the machine shop. So 12 strands of single mode fiber in a direct bury cable which is in turn run through 1-1/2" buried electrical conduit. About 350' of conduit, 430' of fiber. I ended up with about 10' of extra in a roll up in the attic of the machine shop, so I did pretty good on my measurements given the fiber was ordered a year ago, i.e., 6 months before the basement was poured.

The yellow tangle is the polypropylene rope we used to pull the fiber through the conduit. It was *NOT* the rope to use. Cheap, and very stretchy at 400'. So we pulled 5-6' of stretch out of the rope to get a few feet of cable pull and then reset. Very tedious. Should have used something like polyester. You can see the thin initial pull string running up the wall at the bottom of the picture. I was kinda fun tying that to a cheap plastic grocery bag and using a vacuum to suck it through the conduit.
IMG_6199.JPG

IMG_6219.JPG

IMG_6204.JPG

Installed the wall mounted rack just above the conduit entrance in the basement. It houses the network equipment, with some room left over for a NAS and maybe a Raspberry PI or two for possible home automation projects. Some more cleanup of that install required, at least a power strip to the outlet rather than the dangling wall warts.

For the LAN geeks, I'm using Mikrotik equipment, courtesy of someone on this forum who got me started on that brand. Quite a bit klunkier tp configure than the Cisco equipment I was accustom to, but the price is right. CRS309 with 8 SFP+ ports in the shop forms the center of the network. CRS 310-8G+2S+ in each of the five networked buildings, all connections at 10Gbps. The 310's have 2.5Gbps copper ports. That's a good bit of bandwidth but it should last me a good long time without needing upgrade. Wifi 6 (cAP AX) access point. Primary use for now is looking up plumbing and electrical parts at Menards, or checking code on detailed issues. Without wifi from the basement I had to either run upstairs or outside to get enough of a cell signal to have usable internet. Even though the house is far from finished, I may move an old lounge chair in the loft and spend a bit of time with my iPad, enjoying the view and browsing hobby-machinist.com, this winter.
 
Last edited:
Getting the solar/battery system installed. Plenty of work involved, lots of wiring, lots of digging through NEC specs.

10.4 kw of panels. 7.5 kw of inverters. 20kwh of batteries.

IMG_6236.JPG

Black panel on the left is fiber/internet. Middle stuff is general electrical panels. While there is a meter socket included, it is not for a utility meter but rather it is to mount the solar controlled disconnect that separates the house wiring from the utility wiring when the grid power goes down. The actual meter is closer to the shop, and splits a 400a service into two separate disconnects, 200a for the shop, 200a for the house(s). Three boxes on the right are the solar controller, and the two batteries.

The back wall is 3/4" plywood over 2" XPS over poured concrete. The wall is painted with an approved fire rated intumescent paint to give the same fire resistance as type X drywall. I put up 18 ga steel over that behind the batteries. I doubt it would hold up to a complete battery fire, but does add some additional protection. I expect to put up bollard posts in front of the batteries too.

The open circuit breaker panel is controlled by the solar controller's computer, and used for load shedding. So when the grid power is gone it can immediately, or at settable battery levels, disconnect optional loads. The hot tub, bathroom floor warming system, laundry and dishwasher will go on that panel.

Disclaimer: I'm not an electrician. But on the other hand, Indiana doesn't license electricians. It does allow local municipalities to do so, but our county does not. Nor does our county inspect or issue permits. I am a certified installer for the solar equipment, after some online courses and tests. I am skeptical that anyone I hired would do a more careful or safe job, as I have to live with it.
 
Last edited:
Got the solar install done with only a few days to spare. Merry Christmas to me!

This got a bit more rushed than my preferred pace of thinking through details. House building has some vague resemblance to being at work from a retired perspective. Deadlines, too much happening at once, etc. And with a new house most of the solar planning tools are worthless. Start by looking at your house’s energy use for the last year? But I wanted a system with some real backup capabilities, as in keep things running with minor comprises for at least two to three days. So that was my design goal.

We’re set up with whole house backup, but several circuits are on a load shed panel. Oven, dryer, bathroom heat, and hot tub are the big shed-able loads. The system can be set up to either shut those loads off immediately on grid loss, or if the battery charge drops below a selected percentage.

I took a stab at 10 kw of panels, and 20kwh of battery as a good target. Found a reasonable price on some 540 watt panels, paired with 384VA microinverters. Why more panels than inverters? Well, panel specs are an ideal ( think noon at the equator on the equinox on the clearest day possible with perfectly clean panels oriented ideally …). And designing around the one peak day of the year is a bit offsided.

Another related design choice is panel angle. Of course if you have roof mounted panels the angle is set by the roof, but I preferred not to add more complexity to the roof. Seems like a panel maintenance worry. And a roof maintenance worry. And we have some land to work with so space isn’t an issue. The typical panel angle (measured from horizontal) is usually your latitude. That centers the panels on the average sun path, with equal angular deviation from optimal in summer and winter. Of course days are longer in summer, so if you want the max solar power generated in a year you bias toward the summer.

But we’re on net-billing, rather than net metering. So we pay more for a kwh from the rural electricity co-op than they pay us for power generated. So the motivation is to minimize total energy used from the grid and only send them power when we’d otherwise have no use for it. Even though we heat with gas and wood for primary heat, we use more power in the winter. Hot tub, bathroom heater, and water bucket de-icers for the horses all add up. So some winter bias makes sense.

Here’s the spreadsheet I made using pvwatt.nrel.gov’s tool for my location, system, etc. I opted for 40 degrees rather than 34 or so that would be typical.

panel tilt.png

We built the array structure our selves based on engineering plans ( signed and sealed by a PE in Indiana to CYA with the insurance).
IMG_6289.jpeg
That top horizontal rail is 10’ up. The vertical posts go 5’ deep into a 16” concrete pier that extends a total of 8’ deep. Total of 8 posts. Used the shop-built extension boom on the excavator to lift the assembly in place, with wood braces to hold them until concrete. Fortunately for us the concrete truck driver didn’t balk at driving through the old bean field. We were ready to ferry concrete in the loader bucket but that would have meant shoveling it into the piers rather than dumping directly from the truck chute. 4 yards of concrete total.

We assembled the panels in the garage of the new house. Call us wimps but the weather has been a mix of cold, rain,mud and wind.
IMG_6290.jpeg

Each assembly is four solar panels, to make up one column of the array. So 4 panels to an assembly. Each column is 15’ long by 7’6” wide, weighs maybe 400 lbs. While a little tricky to get out of the garage we managed to hoist them out with the boom and then ferry them to the array with the forks on the tractor loader using fork extensions.
IMG_6291.jpeg



IMG_6297.jpegIMG_6300.jpeg

Moving/lifting 400 lbs of glass with an excavator is a challenge for my skills as an amateur heavy equipment operator. We carefully selected days with minimal wind as those panels would not be fun on a windy day.

Lots of little clean up steps to do (including a few hundred zip ties on the array wiring) but done.

Happy holidays to everyone!
 

Attachments

  • IMG_6313.jpeg
    IMG_6313.jpeg
    380.5 KB · Views: 0
  • IMG_6299.jpeg
    IMG_6299.jpeg
    668 KB · Views: 0
  • IMG_6298.jpeg
    IMG_6298.jpeg
    664.5 KB · Views: 0
  • IMG_6295.jpeg
    IMG_6295.jpeg
    735.4 KB · Views: 0
  • IMG_6288.jpeg
    IMG_6288.jpeg
    619.3 KB · Views: 0
Last edited:
Well I misspoke. It is operational, not quite done.
IMG_1679.jpeg
I need to trim the top and side extensions. But first I have to decide what if anything to do about the larger gap between the last two panels on the right. The vertical post came out in the wrong spot precluding mounting the panels with the same gap used on the other panels sets. There is some temptation to leave it alone and plant trees behind it to cover the issue, but I’ll end up fixing it eventually. And plant the trees anyway. Landscaping will come when the ground dries out. It has been nasty working as the mud is the type of clay that quickly accumulates on your boots, which then causes a layer of gravel to adhere when walking across the driveway. This picture was taken mid-afternoon yesterday, today looked much the same, fog. Crazy warm here, temp hovering 60 degrees.
 
Back