Gentlemen,
The flathead V-8 engine is complete. With a total of 16 months and approximately 1900 hours, which includes, design, drawing and machining the project is finished, save starting and tuning. There were a few glitches along the way but nothing major, except the oil pan which the first one started out with the oil pump bulge on the wrong side of the pan. Other than that it has been very satisfying and enjoyable project.
gbritnell
The flathead V-8 engine is complete. With a total of 16 months and approximately 1900 hours, which includes, design, drawing and machining the project is finished, save starting and tuning. There were a few glitches along the way but nothing major, except the oil pan which the first one started out with the oil pump bulge on the wrong side of the pan. Other than that it has been very satisfying and enjoyable project.
gbritnell