I am attempting to make a rack, the work is 2" X 4" x 40", the tooth size is #4 on a 16" G&E shaper. Here is some background, I hope I'm not too wordy. I don't have a shaper vise and tried to use a lighter duty 6" milling machine vise. The vise and work was pushed off the table, I think because the vise didn't align up with the table slots very well. I then clamped the work directly to the table using home-made T-nuts drilled out to use 1/2" studs that I use on the mill. The work was once again pushed off the table bending the studs. I'm either going to make or buy another set of T-nuts for 5/8" studs or bolts.
Here is my new plan, please let me know if you have a better idea or if you think I am on-track to get this machined.

I am going to look for a large piece of angle iron. Drill one arm of the angle iron to match the table T slots and use heavy duty C-clamps to clamp the work to the upright angle.
If this doesn't work, I think I'll have to drill holes in the rack and bolt it to the angle iron. The real question is how to prevent work from moving on the shaper table.

I am attaching two photos, one showing the partial stroke when the work was pushed and a shot of the first tooth cut

Second tooth.jpg

and one of the bent 1/2" studs
bent stud 2.jpg
 
On planers this is prevented by drilled and reamed holes drilled into the table at regular spacing; stops that are simple round pins with a larger collar turned at the top are set in place so that the work bears against them so that the workpiece cannot slide off. G&E made an auxillary (larger) table that bolted down to the machine's regular table with tee slots and holes for the poppets and stop pins for mounting work as it is done on planers.
Poppets are similar to stop pins, but are taller, perhaps 3/4 - 1" and are tapped crosswise at perhaps 5 deg. for a cup point square head setscrew; poppet pins are short round hardened pins, sharpened on one end like a center punch and rounded on the other to fit into the end of the setscrew; the sharp end is pushed against the work from both sides at a downward angle and at an angle towards the stop pin; this holds the work against the stop pin and also holds it down against the table. BTW, at least on my G&E shaper, the vise is provided with a pin through its swivel base that fits into a hold drilled in the table.
I think there would be no downside to drilling and reaming a hole near the end of your table to prevent slippage of the workpiece, perhaps even several, but they should be accurately located so as to be all perpendicular to the table slots on the same center line.
 
As a beginner on a shaper I read this post with great interest. No doubt there are a lot of things I have to learn and will with time like bit shape and sharpness, depth and width of cut. I have learned here that these machines exert a lot of force and work mounting is critical. Also adding a support table for special mountings has started a new line of thought.
A machine that can bend 1/2" bolts is certainly more powerful than my 7" shaper but no doubt many of the operating procedures and set-ups are similar. Something new is learned on this website every day.
Have a good day
Ray
 
As a beginner on a shaper I read this post with great interest. No doubt there are a lot of things I have to learn and will with time like bit shape and sharpness, depth and width of cut. I have learned here that these machines exert a lot of force and work mounting is critical. Also adding a support table for special mountings has started a new line of thought.
A machine that can bend 1/2" bolts is certainly more powerful than my 7" shaper but no doubt many of the operating procedures and set-ups are similar. Something new is learned on this website every day.
Have a good day
Ray
If you think that a shaper that bends 1/2" bolts is impressive, think what a planer with 30 horsepower can do! Cutting 1/2" or more deep with 1/8" feed is nothing.
 
I'm no expert, but I have played a lot with my shaper. I take it your tool is shaped to do the whole cut, and you are moving straight down. What I see, is the force to do the cut will increase dramatically as the tool cuts both sides, and the bottom. What I'm relating to, is a lathe doing threading, you angle the compound so you are mainly cutting one side of the thread.

Perhaps taking a smaller cut is what is needed. as you get deeper, you will still be removing lots of metal on each pass.

The other thought is to do one cut with a straight walled tool, to cut the main part, then go back with the angled side tool, to cut the straight cut into the Vee that you want.

I broke the end off my shars 6 inch vise with my shaper, so be happy you only bent the studs. If you want to do the full cuts, I would devise some bracketry to take some pressure off the end of the vise, and transfer it to the table.
 
If you think that a shaper that bends 1/2" bolts is impressive, think what a planer with 30 horsepower can do! Cutting 1/2" or more deep with 1/8" feed is nothing.
It didn't bend one 1/2" stud but 4, a lot of force is exerted. I wonder if the work started to slip and then locked up causing the bend.
 
I machined a bunch of sections of rack way back in the day of steel, they were about 1 DP and perhaps 8" wide and 5 ft long; they took up most of the planer's 15 ft table. We first slotted them with a parting type of tool then used a left and right handed tool to finish each side of the teeth, using a sample template set up behind the start of the cut, I'd back the table up to set the tool to the template to take each finish cut. The previous post is entirely correct in suggesting this method, rather than a plunge cut to full form; best to rough out the center first.
Of course not everyone has a horizontal mill to do a job like is described, but that certainly is the preferred method, using a regular involute gear cutter.
 
It didn't bend one 1/2" stud but 4, a lot of force is exerted. I wonder if the work started to slip and then locked up causing the bend.
That is quite long at 40"; depending on what material you are using, expect it to bow considerably, especially if you use cold rolled. This is caused by the rolling stresses being relieved by removing so much material from one side.
 
I'm no expert, but I have played a lot with my shaper. I take it your tool is shaped to do the whole cut, and you are moving straight down. What I see, is the force to do the cut will increase dramatically as the tool cuts both sides, and the bottom. What I'm relating to, is a lathe doing threading, you angle the compound so you are mainly cutting one side of the thread.

Perhaps taking a smaller cut is what is needed. as you get deeper, you will still be removing lots of metal on each pass.

The other thought is to do one cut with a straight walled tool, to cut the main part, then go back with the angled side tool, to cut the straight cut into the Vee that you want.

I broke the end off my shars 6 inch vise with my shaper, so be happy you only bent the studs. If you want to do the full cuts, I would devise some bracketry to take some pressure off the end of the vise, and transfer it to the table.

The shaper has auto-downfeed, I think I'm taking .003 per stroke. While I agree that the deeper the bit goes the more metal is removed, I see videos of similar shapers taking 1/2" cuts 3/8" deep per stroke. I am a novice on this machine, I thought I was well below the maximum cut per stroke.
I am no longer trying to use a vise for this job.
 
I machined a bunch of sections of rack way back in the day of steel, they were about 1 DP and perhaps 8" wide and 5 ft long; they took up most of the planer's 15 ft table. We first slotted them with a parting type of tool then used a left and right handed tool to finish each side of the teeth, using a sample template set up behind the start of the cut, I'd back the table up to set the tool to the template to take each finish cut. The previous post is entirely correct in suggesting this method, rather than a plunge cut to full form; best to rough out the center first.
Of course not everyone has a horizontal mill to do a job like is described, but that certainly is the preferred method, using a regular involute gear cutter.

This is the exact method I used to cut the gear to mate with the rack. The length of the rack prohibits me from using the horizontal mill to cut the center out of each tooth. This is hot rolled steel, I am hoping not to have too much curling of the blank.
 