- Joined
- Mar 15, 2015
- Messages
- 119
I'm just starting a long project to rebuild my mini excavator. The framework for the undercarriage is rusted out and has caused the front wheel fork to move around and eventually throw the track.
I have all the material now to do the rebuild and just parted 4 pieces of 3.5" 4340 for the front axle holders.
They will wind up being machined like this.
And will then be pressed into the Guides.
1 down and 3 to go.
I have all the material now to do the rebuild and just parted 4 pieces of 3.5" 4340 for the front axle holders.
They will wind up being machined like this.
And will then be pressed into the Guides.
1 down and 3 to go.
Last edited: