- Joined
- Feb 22, 2015
- Messages
- 107
An appliance dolly was used to move the lathe bed into the basement. The rest of the lathe components were hand carried.
Edit: added the chip tray weight and corrected the motor without pulley and the apron weights.
Last edited: