I just bought a 1/4 acre lot in a city in Ohio where I go to welding school two months a year.
There was a house on the lot, but maybe a tornado took it away. The lot is clear now. The lot is in town in the suburbs.
I am thinking that I will build a 2 car garage so that I can have enough room to do welding & machining on the evenings & weekends because school is only 36 hours/week. I only have enough money to build a 2 car garage with power and a bathroom in the garage.
So hopefully the city will just let me build a 2 car garage with a bathroom in it on this bare lot.
I need at least two 220V outlets. One welder I have calls for a 100A breaker, so that is something to tell the architect.
I will be doing this with proper permits. I would like to have it ready to go in Spring 2021, but I think there might be an issue with having to pour the concrete foundation in the warmer months.
There was a house on the lot, but maybe a tornado took it away. The lot is clear now. The lot is in town in the suburbs.
I am thinking that I will build a 2 car garage so that I can have enough room to do welding & machining on the evenings & weekends because school is only 36 hours/week. I only have enough money to build a 2 car garage with power and a bathroom in the garage.
So hopefully the city will just let me build a 2 car garage with a bathroom in it on this bare lot.
I need at least two 220V outlets. One welder I have calls for a 100A breaker, so that is something to tell the architect.
I will be doing this with proper permits. I would like to have it ready to go in Spring 2021, but I think there might be an issue with having to pour the concrete foundation in the warmer months.