I used an inexpensive HF multi-meter in the video.
All you really need is a meter capable of measuring resistance
Once I get the wires exposed I’ll next need to determine or verify I have the probes checking the appropriate windings.
Baby steps, I’m a royal PITA.
 
Ok, this is what I have.
What does it say?
 

Attachments

  • 6C53E294-3B3C-4A73-9408-D7B48410E5B1.jpeg
    6C53E294-3B3C-4A73-9408-D7B48410E5B1.jpeg
    737.8 KB · Views: 16
  • 403AA754-C275-4D4C-AF50-D945A4BD3DCD.jpeg
    403AA754-C275-4D4C-AF50-D945A4BD3DCD.jpeg
    428.9 KB · Views: 15
  • 8BF72555-2F6C-4B09-94E4-67C62B8A04AE.jpeg
    8BF72555-2F6C-4B09-94E4-67C62B8A04AE.jpeg
    409.8 KB · Views: 11
on the surface it appears the main windings have continuity, which is good

the next step will be testing the T5- it is the start leg
remove the capacitor cover and discharge the capacitor
remove one leg from the capacitor and test that lead against T5
then remove the other capacitor leg and test it against T5
if there is continuity on one of the capacitor leads, that's a good sign

we would next go to the centrifugal start switch next, if the above tests work out positive
 
There's one missing- where is T8?
Between T5 and T8 you should see the meter swing toward zero and then climb to infinity (OL)
Reverse the test leads and the same should happen. This tests the entire start circuit (start leg in the lingo)
It's helpful if your meter has a bar graph display to simulate an analog meter (best is to actually have a cheap analog meter with a needle)
-Mark
 
Last edited:
Back
Top