The VN 12 begins to go together

HMF

Site Founder
Administrator
Joined
Sep 22, 2010
Messages
7,223
I previously connected the base (400 pounds) and the column (400 pounds) with the anchor pins and bolts from inside the coolant tank in the base.
Then I used my Skyhook to hoist the ram assembly on top of the column. It will be shoved back to engage the feed screw with the bronze bearing in the column.

20131208_173410.gif20131208_173433.gif20131208_173457.gif20131208_173531.gif

Next, I will assemble the knee assembly and saddle for the table.
Things are very tight in there since I installed the bathroom.

20131208_173410.gif 20131208_173433.gif 20131208_173457.gif 20131208_173531.gif
 
Last edited by a moderator:
Back
Top