I previously connected the base (400 pounds) and the column (400 pounds) with the anchor pins and bolts from inside the coolant tank in the base.
Then I used my Skyhook to hoist the ram assembly on top of the column. It will be shoved back to engage the feed screw with the bronze bearing in the column.
Next, I will assemble the knee assembly and saddle for the table.
Things are very tight in there since I installed the bathroom.
Then I used my Skyhook to hoist the ram assembly on top of the column. It will be shoved back to engage the feed screw with the bronze bearing in the column.
Next, I will assemble the knee assembly and saddle for the table.
Things are very tight in there since I installed the bathroom.