- Joined
- Dec 27, 2017
- Messages
- 340
Once I get the cross members welded in, I will need to go ahead and fabricate the landing gear and skids and get sitting on its own legs. I have this set up so the engine gets rolled underneath the frame (between the skids) and hoisted up into position with a transmission jack. Once I find myself in that situation, The engine will have it's own carriage that mates to mounting points on the frame. Once all of that gets done, it's on to the sprag pulley / clutch and the main rotor transmission.