That is the truth. You just don't realize how long everything takes when dealing with items that heavy. Took two of us almost an hour to get the mill off the pallet and onto the dolly. Then another hour to get the x-table off (yes, stupid me tried to do it without loosening the gibs). Another hour to get it downstairs, with 20 minutes of it spent on the landing between first floor and the basement, trying to get it moving again. And the last hour was spend disassembling the shop crane, getting it to the basement, reassembling it, hoisting the mill high enough to slide over the stand, and then slowly positioning it so the screw holes align. Better than any gym workout.