- Joined
- Jan 2, 2019
- Messages
- 7,115
I spent the past week getting our home in Michigan ready for winter. One of the things on the list was fixing a leak on the claw foot tub in our upstairs bathroom. The tub is original to the house and after having tile done and just about everything else replaced I had a challenge getting the drain plumbing working right.
Pieces, old and new.
Turned the Od on a PVC fitting.
Test fit
ID and chamfer on the flange. Also shortened things up cause it’s tight down there.
Ready for glue. PVC, epoxy and marineTex putty.
Mixing
In place. Yes dirty floor but that’s a different story.
More later....
John
Pieces, old and new.
Turned the Od on a PVC fitting.
Test fit
ID and chamfer on the flange. Also shortened things up cause it’s tight down there.
Ready for glue. PVC, epoxy and marineTex putty.
Mixing
In place. Yes dirty floor but that’s a different story.
More later....
John