- Joined
- Dec 18, 2019
- Messages
- 6,617
Thanks for the recommendation. I'll see what I can find at the steelyard.I'd put a whole panel on the back side, of 14 or 16 ga steel, welded to the tubing. THe ends can easily be stiffened with diagonals. leave the front open, as to do anything else is a waste of space in a small shop...
You aren't kidding about a small shop. A lot of rearranging had to happen to shoehorn this into the space.