- Joined
- Jan 31, 2016
- Messages
- 11,450
The past 6 weeks have been adventure packed to say the least . Cleaned up the entire back yard of large logs . Cut , split and ready for the woodstove . Had the entire HVAC system replaced in the living house . Finally got the water drained out of the oil tank down the shop house . 26 gallons of water were drained . Had to replace the fill vent pipe which was rusted thru at ground level . Had all new doors installed on the shop house last week . Next 2-3 days , I have to build a new retaining wall around the patio down at the shop house . The patio has an 8' sliding door for machine entry and removal . The one hill has been a thorn in my side for 25 years now so this will be the last go around on this wall . I have about 20 treated 6 x 6s and GREAT weather up until Sunday so have to get my **** together quickly .