The place is pretty-much torn apart but, the heavy machines are still in place. They will remain in place too. I'm cleaning/organizing from back to front, going thru all the boxes, shelves etc. Much stuff is being pitched and a lot of stuff is getting shifted around and moved closer to their final destination. I'm in a jam because the toolboxes have not arrived so, I can't put any tools away yet.
If the toolboxes were here, I could finish the re-org work with two more 8-hour days plus one more day to rewire the ceiling lights. I'm going to break the lights up to 4 zones. One above the lathe then, above the mill, above the welding table and finally above the sawing, grinding and drill press area.
Evening coffee break time. (Did I happen to mention, I really like coffee?).
Ray
If the toolboxes were here, I could finish the re-org work with two more 8-hour days plus one more day to rewire the ceiling lights. I'm going to break the lights up to 4 zones. One above the lathe then, above the mill, above the welding table and finally above the sawing, grinding and drill press area.
Evening coffee break time. (Did I happen to mention, I really like coffee?).
Ray