- Joined
- Oct 4, 2016
- Messages
- 7,024
I'm very close to putting the down on this lathe, there are seven 3 phase available in mid Nov, all single phase are gone. I'm still learning, and the PM1228 has been good, but it's my feeling I could use a better machine, both size, and power, I'll have to self improve to use the precision. The airport contract (my current cash cow)ends on Dec 31st, so the cash flow will decrease dramatically then. It's easy to rationalize with myself. What reservations do you have on this?