Building my last shop

Very sharp. What is the first project/job?
Robert
Not sure I have so many. :D Probably do the neighbors " hey man can you help me out" stuff since he has been helping me out.
 
Electrician showed up today. Got the 3 phase drops up. Putting the 110 drops up tomorrow and we will be done with the electrical. Thank goodness because I have spent 10 grand so far. 2/3's of that is on materials. The stuff just keeps going up in price. For instance the high bay lights I put up I paid $130 bucks each for them. They are now $200. Ugh.
drops.jpg
I forgot to mention we are putting in male & female twist lock connects at the machines. That way when I need to hover over a machine with the gantry crane I can just un plug the drops, and move the gantry where I need it.
 
Electrical is done! :drink:Fired up all the machines and they all rotated in the right direction. :D
electrical.jpg
Hope to pour concrete on Monday in front of the shop entrance. 40x15 pad. After that I am done with the shop build and broke.
 
Back
Top