- Joined
- Sep 3, 2023
- Messages
- 339
The problem with this crane project, is it's the only project I really need a crane for. It's quite the chicken and egg problem.
Bunch of welding done this afternoon. By design it's pulled in just a little in the middle. (It's upside down in this photo). When load is applied to the yet to be built carriage that carries the chan fall, it will tend to spring out some. It's about 1/4" in on the middle compared to the edges, which seems about right.
View attachment 472603
Not I gotta flip this over, without disassembling it. Somehow, I think the car lift will be involved.
Car lift would definitely be involved in my shop, if I had mine setup, that is.
You should be able to span a piece between the arms, and use that to flip the carriage.
Sent from my iPhone using Tapatalk