Finally have the house cooled down after two days of no power. Mounted new kick, gear change and center stand rubbers. Mounted footpeg rubbers on stems and the plate for the left footpeg/engine mount then the footpeg stem. Mounted and connected the footbrake peddle and adjusted it. Bike is over against workbench to permit squeezing down the left side to get by and work on it. Will have to move it over for mounting right side plate and peg, plus get to the lathe to spin out a couple footpeg locating pins for the right side.
The tank is setting bolted to the WorkMate waiting for Bondo, just too humid to work on it outside. Rubbers and studs came in for mounting it. Tried some test fitting, and the front of the seatpan will need massaged a bit with a rubber mallet to clear the rear tank mount.
The tank is setting bolted to the WorkMate waiting for Bondo, just too humid to work on it outside. Rubbers and studs came in for mounting it. Tried some test fitting, and the front of the seatpan will need massaged a bit with a rubber mallet to clear the rear tank mount.